Being traded midseason is difficult for any player. Picking up your entire life, saying goodbye to your teammates, and then being expected to mesh with a new ball club is a tall task for any player. However, some MLB players have not only meshed with their new teams but have become a cornerstone in their team.
Many players were traded at the deadline this season, with some already making an immediate impact on their new squads. Which players have made a splash in their first few games, and which has been the best?
- Max Scherzer Goes Perfect in Dodgers Regular Season (2021)
In a deal that included two superstars, Max Scherzer and Trea Turner were sent to the Dodgers. The Dodgers were chasing the red-hot Giants for the NL West crown and needed Scherzer to add life to their depleted bullpen. Scherzer provided the boost they needed and delivered exceptional pitching performances.
Scherzer was dialed in in his debut, striking out ten batters through seven innings. This foretold Scherzer’s performance the rest of the season, as he would go 7-0 with a 1.98 ERA, 1.96 FIP, and 0.82 WHIP in 11 regular-season starts for the Dodgers. His performance on the mound elevated the Dodgers’ play and earned them a spot in the NLCS.
- CC Sabathia Magical Brewer’s Half Season (2008)
After winning the AL Cy Young award for the Cleveland Indians, Sabathia was dealt to the Milwaukee Brewers right before the All-Star Break. His first outing in Milwaukee was less than spectacular as he went six complete, allowing five hits and three runs, two of which were earned, all on 97 pitches, but he did earn the win.
This poor performance lit a fire in CC, who went on to have an unbelievable season in Milwaukee. Over 17 starts for his new club, he went 11–2 with a 1.65 ERA and 128 strikeouts in 130 2/3 innings. This included seven complete games and three shutouts. More importantly than any stat, CC Sabathia’s contributions on the mound propelled the Brewers to the playoffs for the first time in 25 years.
- Mannywood Takes Over Los Angeles (2008)
After being traded to the Los Angeles Dodgers from the Boston Red Sox in July 2008, Manny Ramirez experienced a remarkable career resurgence. Although his debut game with the Dodgers was modest, as he went 2-for-4, it was clear that Ramirez was beginning to find his rhythm. In his second game, he hit his first home run for the Dodgers, and by his third game, he had already added another home run to his tally. Ramirez continued to impress with four hits in one game and another home run.

